Remote Energy and Back Up Supply

Sector:

Construction

Our construction client was seeking a supplier to provide a temporary energy solution to its central London construction site.

A Stage V 100KVA Generator and 1,000ltr fuel tank was supplied as well as a 45/90 Off Grid LX BESS Unit.

Our client’s objectives were to:

  • Source a low emission generator to power its office and welfare units
  • Source a BESS unit as back up to power the onsite crane
  • Have fuel supplied on delivery of the generator
  • Have clear visibility of generator and fuel usage

 
Our service included:

  • Supply of Stage V generator, fuel tank, fuel and BESS unit
  • Weekly telematic reports provided to the client